General Information

K-RERA/PRJ/155/2021
TREESA GARDENS
PAUL ALUKKAS DEVELOPERS PRIVATE LIMITED
Villas (Plots & Buildings)
29/03/2025
Click Here

Quarterly updated values

Project Information

TREESA GARDENS
Villas (Plots & Buildings)
18/03/2017
28/02/2025
No
No

Land Details

4047
15
3199.37
3075.37
124
6
0

Location Details of the Project Area

197/6/2, 198/3/A, 197/6/1, 198/3/B
43672
KERALA
Ernakulam
Kanayannur
EDAPPALLY SOUTH
ELAMAKKARA
ELAMAKKARA
682026
ROAD, ANTONY THARAKAN AND OTHERS
DRAINAGE
PROPERTY OF TITTO AND CORPORATION DRAINAGE
PROPERTY OF KASIM, JOSEPH AND SAMEERA.

Mortgages

Promoter's Information - Other Than Individual


Company
PAUL ALUKKAS DEVELOPERS PRIVATE LIMITED
No
No

Registered address of the Promoter

PENTA SQUARE BUILDING
M G ROAD
1ST FLOOR
OPP.KAVITHA THEATRE
KERALA
Ernakulam
Kanayannur
COCHIN
682035

Address for official communication

PENTA SQUARE BUILDING
M G ROAD
1ST FLOOR
OPP.KAVITHA THEATRE
KERALA
Ernakulam
Kanayannur
COCHIN
682035
Member Name Designation Address Contact Email Photo
LUCY PAUL Director ALUKKA HOUSE, CHILAVANOOR ROAD, , Kanayannur, KERALA, 682020 9447000916 marketing@paulalukkasdevelopers.com View Photo
PAUL ALUKKA Managing Director ALUKKA HOUSE, CHILAVANOOR ROAD, , Kanayannur, KERALA, 682020 9447000916 paulalukkasdevelopers@hotmail.com View Photo
PAUL ALUKKA Authorized Signatory ALUKKA HOUSE, CHILAVANOOR ROAD, , Kanayannur, KERALA, 682020 9447000916 paulalukkasdevelopers@hotmail.com View Photo

Land owner details

Promoter's Past Experience Details

Building Permit Details

Building Permit Number Dated Type Date of Expiry Issued by Name of the Local body/ LSGI

Development Permit Details

Development Permit Number Dated Type Date of Expiry Issued by Name of the Local body/ LSGI

Building Details

Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 TREESA GARDENS VILLA 1 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 191.82 0 13.58 0 0 19.95 238.46 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 19.94 1 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 TREESA GARDENS VILLA 5 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 140.86 0 7.76 0 0 17.18 177.44 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 14.51 1 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 TREESA GARDENS VILLA 6 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 130.33 0 7.76 0 0 17.18 177.44 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 14.51 1 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 TREESA GARDENS VILLA 10 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 140.86 0 7.76 0 0 17.18 177.49 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 14.51 1 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 TREESA GARDENS VILLA 11 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 140.46 0 7.76 0 0 17.18 177.44 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 14.51 1 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 TREESA GARDENS VILLA 12 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 160.69 0 20.89 0 0 18.41 221.69 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 20.89 1 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 Villa 2 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 202.07 0 20.07 0 0 22.66 249.78 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 20.96 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
8 Villa 3 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 191.35 0 19.50 0 0 21.50 236.41 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 18.78 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
9 Villa 4 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 142.35 0 8.50 0 0 19.30 188.64 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 14.52 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
10 Villa 7 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 144.50 0 7.76 0 0 17.18 201.14 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 16.70 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
11 Villa 8 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 140.86 0 7.76 0 0 17.18 177.44 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 14.51 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
12 Villa 9 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 140.86 0 7.76 0 0 7.76 177.44 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 14.51 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Slabs of Super Structure
4 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
5 Sanitary Fittings
6 Electrical Fittings
7 Staircases, Lifts Wells
8 Overhead and Underground Water Tanks.
9 The external plumbing and external plastering
10 Completion of terraces floor each building
11

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
13 Villa 13 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 172.49 0 20.80 0 20.80 18 239.09 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 19.80 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
14 Villa 14 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 145.85 0 8.50 0 0 18 196.82 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 13.48 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
15 Villa 15 01/03/2023 0 0 2 0 0 1

Apartments/Villas Type Details

Sr.No. Apartment/Villa Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 174.73 0 14.78 0 0 18.81 221.69 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 20.89 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Plot Details

Area of Plot (In sqmts) Number of Plots Number of Plots Booked / Alloted / Sold
Current value Last Quarter value
4047 15 0 NA
4047 15 0 NA

Common Areas and Facilities

Project Details

Name Proposed Number Progress of work done (In %)
Current value Last Quarter value
Number of Garages/ Covered Parking (In Numbers) (Common Area) 3

Development Work

Common areas And Facilities, Amenities Proposed Percentage of completion Details
Current value Last Quarter value
Water conservation, Rain water harvesting :
Landscaping & Tree planting :
Open parking :
Water supply :
Sewerage (Chamber, Lines, Septic tank, STP) :
Storm water drains :
Street lighting :
Visitors Parking :
Aggregate area of recreational open space :
Electrical meter room, Sub-station, Receiving station :
Internal Roads & Footpaths :
Solid waste management and disposal :

Professional Information

Professional Name RERA Certificate No. Professional Type Type of Contractor Registration Number Name of the firm Address of the firm Year of establishment Name of Promoters Associated with Key projects completed Type of Professional
THOMAS K GEORGE NA Architect NA CA/94/17403 JIBU AND THOMAS ARCHITECTS G-173, PANAMPILLY NAGAR, NEAR GCDA, COCHIN - 36 1996 NOEL GREEN NATURE NA
K M LATHEEF NA Engineer NA M1574153 K M LATHEEF KAVANADU HOUSE, HARITHA ROAD, VENNALA P O, COCHIN-28 2014 PAUL ALUKKAS DEVELOPERS P LTD ECOPARADISE NA
TINU ANTO NA Chartered Accountant NA 01462S K J ANTO AND CO 1ST FLOOR, MAREENA BUILDINGS, RAVIPURAM, M G ROAD KOCHI - 682016 2012 PAUL ALUKKAS DEVELOPERS P LTD ECOPARADISE NA

Uploaded Documents

Document Name Uploaded Document Remarks Uploaded Date
PROJECT DETAILS
Copy of Sanctioned Plans 29/07/2021 14:18:42
Copy of Sanctioned Plans 29/07/2021 14:19:06
Copy of Sanctioned Plans 29/07/2021 14:19:30
Copy of Sanctioned Plans 29/07/2021 14:20:02
Copy of Sanctioned Plans 29/07/2021 14:20:36
Copy of Sanctioned Plans 29/07/2021 14:20:51
Copy of Valid Building Permit 29/07/2021 14:01:18
Copy of Valid Building Permit 29/07/2021 14:01:48
Copy of Valid Building Permit 29/07/2021 14:02:07
Copy of Valid Building Permit 29/07/2021 14:02:59
Copy of Valid Building Permit 29/07/2021 14:03:23
Copy of Valid Building Permit 29/07/2021 14:03:41
Copy of Valid Building Permit 29/07/2021 14:04:00
Copy of Valid Development Permit (For villa projects & plot development pojects) 29/07/2021 14:07:03
Detailed technical specifications to be adopted in the project 29/07/2021 15:34:13
Detailed technical specifications to be adopted in the project 29/07/2021 15:34:34
Layout approval plan 08/10/2021 15:21:49
Location details of the project with clear demarcation of land with boundaries including Latitude and Longitude of end points
Site Plan / Site Map 08/10/2021 15:27:26
LAND DETAILS
Copy of latest Land Tax Receipt 29/07/2021 15:29:19
Copy of Title Deed 29/07/2021 15:25:18
Copy of Title Deed 29/07/2021 15:25:51
Copy of Title Deed 29/07/2021 15:26:09
Copy of Title Deed 29/07/2021 15:26:24
Copy of Title Deed 29/07/2021 15:26:55
Copy of Title Deed 29/07/2021 15:27:08
Land title search report (From an advocate as specified in Rule 17) 02/11/2021 11:58:06
Latest Encumbrance certificate 29/07/2021 15:29:48
Latest Encumbrance certificate 29/07/2021 15:30:08
Proforma of Conveyance Deed / Sales Deed 29/07/2021 14:25:24
PROMOTER DETAILS
Declaration / Affidavit in Form B 29/07/2021 14:00:26
The annual report including audited profit and loss account, balance sheet, cash flow statement, directors report and auditor's report of the promoter for the immediately preceding three financial years and where annual report is not available then the audited profit and loss account, balance sheet, cash flow statement and the auditor's report of the promoter for immediately preceding three financial years and in case of newly incorporated or registered entity, such information shall be disclosed for the parent entity. 08/10/2021 14:23:57
The annual report including audited profit and loss account, balance sheet, cash flow statement, directors report and auditor's report of the promoter for the immediately preceding three financial years and where annual report is not available then the audited profit and loss account, balance sheet, cash flow statement and the auditor's report of the promoter for immediately preceding three financial years and in case of newly incorporated or registered entity, such information shall be disclosed for the parent entity. 08/10/2021 14:24:47
The annual report including audited profit and loss account, balance sheet, cash flow statement, directors report and auditor's report of the promoter for the immediately preceding three financial years and where annual report is not available then the audited profit and loss account, balance sheet, cash flow statement and the auditor's report of the promoter for immediately preceding three financial years and in case of newly incorporated or registered entity, such information shall be disclosed for the parent entity. 08/10/2021 14:30:29
ALLOTMENT DETAILS
Proforma of Agreement for Sale (As per Annexure A) Note - Promoter is directed to stick on original clauses of Annexure A. No alterations/additions/omissions are allowed in words/sentences/clauses. 29/07/2021 14:24:20
Proforma of Allotment Letter (As per the Authority order No. K-RERA/T1/1657/2024 dated 26/11/2024) 29/07/2021 14:22:13
ARCHITECT,ENGINEER & CA Certificates
Architect's Certificate in Form No 2 29/07/2023 17:48:20
Architect's Certificate in Form No 2 29/07/2023 17:49:31
Architect's Certificate in Form No 2 16/11/2023 16:48:06
Chartered Accountant's Certificate in Form No 4 (in letter head) 29/07/2023 17:20:14
Chartered Accountant's Certificate in Form No 4 (in letter head) 29/07/2023 17:20:22
Chartered Accountant's Certificate in Form No 4 (in letter head) 29/07/2023 17:20:29
Chartered Accountant's Certificate in Form No 4 (in letter head) CA CERTIFICATE 2023-24 Q1 29/07/2023 17:25:44
Chartered Accountant's Certificate in Form No 4 (in letter head) 16/11/2023 16:52:10
Chartered Accountant's Certificate in Form No 4 (in letter head) 16/11/2023 16:52:13
Chartered Accountant's Certificate in Form No 4 (in letter head) 16/11/2023 16:52:20
Engineer's Certificate in Form No 3
NOC and other Clearance
Clearance from Airport Authority of India
Clearance from Coastal Zone Management Authority
Clearance from National Highways / Railways / Other Relevant Departments
Concurrence / Layout Approval of LSG planning department
Consent to establish (Clearance from Pollution Control Board)
Environment Clearance
If the project is proposed to be developed in Phases, an authenticated copy of license or land use permission, Building sanction plan or building permit for each of such phases (If applicable)
Initial NOC from Fire and Rescue department
Permission from Water and sewerage department
BROCHURE & OTHER DETAILS
Others 08/10/2021 15:59:08
Others 08/10/2021 16:53:59
Others 08/10/2021 16:59:25
Others 11/10/2021 18:06:51
Sanction letters from Bank for construction finance
Sanction letters from bank for home loan tie-ups 08/10/2021 16:03:13
PLAN OF DEVELOPMENT WORKS
Charts and the project schedule
List and details of common amenities
Other Plans to be executed in the proposed project
Plan for Drinking water service to be executed in the proposed project
Plan of firefighting to be executed in the proposed project
Plan of Use of renewable energy to be executed in the proposed project
BROCHURE & OTHER DETAILS
Brochure / prospectus issued in regard to this project 08/10/2021 14:40:10
Completion plan (if any)
Consent to operate (Clearance from Pollution Control Board)
Declaration by the Promoter - Form No. 6
Details of the Association formed
Development certificate(for plots and villas) Development Permit Extended Upto 07.10.2025 23/11/2024 16:05:33
Final Fire NOC
Occupancy Certificate Occupancy certificate of Villa No.1 25/04/2024 15:33:07
Occupancy Certificate Occupancy certificate of Villa No.2 25/04/2024 15:33:53
Occupancy Certificate Occupancy Certificate of Villa No.4 25/04/2024 15:34:43
Occupancy Certificate Occupancy Certificate of Villa No.6 25/04/2024 15:35:24
Occupancy Certificate Occupancy Certificate of Villa No.10 25/04/2024 15:36:59
Occupancy Certificate Occupancy Certificate of Villa No.15 25/04/2024 15:38:12
Occupancy Certificate Occupancy Certificate of Villa No.7 25/04/2024 15:44:44
Occupancy Certificate Occupancy Certificate of Villa No.12 25/04/2024 15:45:22
Occupancy Certificate Occupancy Certificate of Villa No.13 25/04/2024 15:46:04
Occupancy Certificate Occupancy Certificate of Villa No.3 06/07/2024 15:15:38
Occupancy Certificate Occupancy Certificate of Villa No.8 19/10/2024 16:55:34
Occupancy Certificate Occupancy Certificate of Villa No.5 29/03/2025 22:42:28
Occupancy Certificate Occupancy Certificate of Villa No.9 29/03/2025 22:43:33
Occupancy Certificate Occupancy Certificate of Villa No.11 29/03/2025 22:44:31
Occupancy Certificate Occupancy Certificate of Villa No.14 29/03/2025 22:45:28
Occupancy Certificate Occupancy Certificate of Club House 29/03/2025 22:47:07
Land Owner Details
Registered Joint Development Agreement

Upload Photograph

Document Name Uploaded Document Uploaded Date
Photograph of each building 07/01/2025 20:11:45
Photograph of each building 07/01/2025 20:08:29
Photograph of each building 07/01/2025 20:08:02
Photograph of each building 07/01/2025 20:07:39
Photograph of each building 07/01/2025 20:06:45
Photograph of each building 07/01/2025 20:06:19
Photograph of each building 07/01/2025 20:03:52
Photograph of each building 07/01/2025 20:00:13
Photograph of each building 07/01/2025 20:00:08
Photograph of each building 07/10/2024 23:38:15
Photograph of each building 07/10/2024 23:38:13
Photograph of each building 07/10/2024 23:36:30
Photograph of each building 07/10/2024 23:36:03
Photograph of each building 07/10/2024 23:35:34
Photograph of each building 07/10/2024 23:35:32
Photograph of each building 07/10/2024 23:13:38
Photograph of each building 07/10/2024 23:12:09
Photograph of each building 07/10/2024 23:11:03
Photograph of each building 07/10/2024 23:10:21
Photograph of each building 06/07/2024 15:18:54

Litigations Related to the Project