KeralaRERA Application

General Information

T1/OL/004/2021
15/03/2021


Promoter's Information - Individual

Mahesh
Ayanimoodu
Vijayan
Vijayan Ayanimoodu Damodaran
No

Permanent address of the Promoter

TC 14/1109 / 2 DWARAKA
Hilltop housing colony
Thuruvikal P.O.
Near KIMS Hospital
KERALA
Thiruvananthapuram
THIRUVANANTHAPRUAM
695011

Address For Official Communication

TC 14/1109 / 2 DWARAKA
Hilltop housing colony
Thuruvikal P.O.
Near KIMS Hospital
KERALA
Thiruvananthapuram
THIRUVANANTHAPRUAM
695011

Contact Details

https://www.dascobuilder.com/

Promoter's Track Record

0
0
0
0
1
1518

Project Information

On-Going Project
Dasco Royal Valley Phase 1
Mixed (Plots & Buildings)
25/08/2019
05/11/2022
No
No

Land Details

8078
10
1517.82
1364.55
153.27
9
1

Location Details of the Project Area

359/22/2
19729
KERALA
Thiruvananthapuram
Nedumangad
VEMBAYAM
Vembayam Road
Pothencode
695584
Property of Sanal Kumar, Santhigiri Ashramam
Private road
Property of Rajan,Abdul Salam
Private road

Mortgages

Building Permit Details

Building Permit Number Dated Type Date of Expiry Issued by Name of the Local body/ LSGI
01/11/2018 05/06/2022 Secretary Vembayam Grama Panchayat

Development Permit Details

Development Permit Number Dated Type Date of Expiry Issued by Name of the Local body/ LSGI
A4-BA(131605)/2019 01/11/2018 New 05/06/2022 Secretary Vembayam Grama Panchayat

Building Details

Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 VILLA NO 23 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 139.39 0 23.61 0 0 0.00 180.95 1 0

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 Stilt Floor 0
4 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 100
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 100
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 100
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 100
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

100
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 80
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 VILLA NO 24 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 172.69 0 34.47 0 0 0.00 226.66 1 0

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 Stilt Floor 0
4 X number of Slabs of Super Structure 0
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 VILLA NO 25 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 139.39 0 23.60 0 0 0.00 181.14 1 0

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 Stilt Floor 0
4 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 50
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 60
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 41
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 VILLA NO 27 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 139.39 0 23.60 0 0 0.00 181.14 1 1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 Stilt Floor 0
4 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 30
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 33
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 VILLA NO 28 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 95.92 0 13.51 0 0 0.00 123.08 1 1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 Stilt Floor 0
4 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 32.5
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 VILLA NO 29 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 109.29 0 18.92 0 0 0.00 145.84 1 0

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 Stilt Floor 0
4 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 60
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 36
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 VILLA NO 30 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 109.29 0 18.92 0 0 0.00 145.84 1 1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 Stilt Floor 0
4 X number of Slabs of Super Structure 0
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
8 VILLA NO 31 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 110.64 0 23.22 0 0 0.00 151.88 1 0

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 Stilt Floor 0
4 X number of Slabs of Super Structure 50
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 25
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 27.5
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
9 CLUB HOUSE 0 0 2 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Others-RECREATIONAL AREA 136.84 0 0 0 0 0.00 153.27 0 0

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 Stilt Floor 0
4 X number of Slabs of Super Structure 0
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
10 VILLA NO 26 0 0 2 0 0 1

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
1 Bangalow / Villas 139.39 0 23.60 0 0 0.00 181.14 1 1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
1 Excavation 100
2 X number of Basement(s) and Plinth 100
3 Stilt Floor 0
4 X number of Slabs of Super Structure 100
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 65
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 70
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 43.5

Plot Details

Area of Plot (In sqmts) Number of Plots Number of Plots Booked / Alloted / Sold
8078 10 01

Common Areas and Facilities

Project Details

Name Proposed Number Progerss of work done (In %)
Number of Garages/ Covered Parking (In Numbers) (Common Area) 0 0

Development Work

Common areas And Facilities, Amenities Proposed Percentage of completion Details
Internal Roads & Footpaths : YES 0 NA
Visitors Parking : NO 0 NA
Water conservation, Rain water harvesting : YES 0 NA
Energy Management : NO 0 NA
Fire protection and Fire safety requirements : NO 0 NA
Electrical meter room, Sub-station, Receiving station : YES 0 NA
Aggregate area of recreational open space : NO 0 NA
Open parking : NO 0 NA
Water supply : YES 10 NA
Sewerage (Chamber, Lines, Septic tank, STP) : YES 0 NA
Storm water drains : YES 0 NA
Landscaping & Tree planting : YES 0 NA
Street lighting : YES 0 NA
Community buildings : YES 0 NA
Treatment and disposal of sewage and sullage water : NO 0 NA
Solid waste management and disposal : YES 0 NA
Public health services : NO 0 NA

Professional Information

Professional Name RERA Certificate No. Professional Type
VEENA DATHAN NA Architect
SAJU ARAVIND NA Engineer
RENUKA K NA Chartered Accountant

Uploaded Documents

Document Name Uploaded Document Remarks
Copy of PAN card
The annual report including audited profit and loss account, balance sheet, cash flow statement, directors report and auditor's report of the promoter for the immedietly preceding three financial years and where annual report is not available then the audited profit and loss account, balance sheet, cash flow statement and the auditor's report of the promoter for immedietly preceding three financial years and in case of newly incorporated or registered entity, such information shall be disclosed for the parent entity.
Consent to establish & operate (Clearance from Pollution Control Board)
Environment Clearance
NOC from Fire and Rescue department
Permission from Water and sewerage department
Clearance from Airport Authority of India
Clearance from National Highways / Railways / Other Relevant Departments
Clearance from Coastal Zone Management Authority
Site Plan / Site Map
Layout approval plan
Concurrence of Town and Country planning department
If the project is proposed to be developed in Phases, an authenticated copy of license or land use permission, Building sanction plan or building permit for each of such phases
Copy of Building Permit Villa No 23
Copy of Building Permit Villa No 24
Copy of Building Permit Villa No 25
Copy of Building Permit Villa No 26
Copy of Building Permit Villa No 27
Copy of Building Permit Villa No 28
Copy of Building Permit Villa No 29
Copy of Building Permit Villa No 30
Copy of Building Permit Villa No 31
Copy of Building Permit Clubhouse 32
Copy of Development Permit
Copy of Sanctioned Plans Villa 23
Copy of Sanctioned Plans Villa 24
Copy of Sanctioned Plans Villa 25
Copy of Sanctioned Plans Villa 26
Copy of Sanctioned Plans Villa 27
Copy of Sanctioned Plans Villa 28
Copy of Sanctioned Plans Villa 29
Copy of Sanctioned Plans Villa 30
Copy of Sanctioned Plans Villa 31
Copy of Sanctioned Plans Clubhouse 32
Performa of Allotment Letter
Performa of Agreement for Sale (As per Annexure A)
Performa of Conveyance Deed
Copy of Title Deed
Land title search report
Copy of latest Land Tax Receipt
Details of Encumbrance
Occupancy Certificate/ Completion Certificate/ development certificate
The Plan of development works to be executed in the proposed project
Brochure / prospectus issued in regard to this project
Sanction letters from Bank for construction finance
Sanction letters form bank for home loan tie-ups SBI sanction letter
Sanction letters form bank for home loan tie-ups HDFC sanction letter
Location details of the project with clear demarcation of land with boundaries including Latitude and Longitude of end points
Detailed technical specifications to be adopted in the project
Others Declaration for financial statement and common amenities

Upload Photograph

Document Name Uploaded Document
Photograph of each building
Photograph of each building
Photograph of each building
Photograph of each building
Photograph of each building
Photograph of each building
Photograph of each building
Photograph of each building
Photograph of each floor
Photograph of each floor
Photograph of each floor
Photograph of each floor
Photograph of each floor
Photograph of each floor
Photographs of common areas and internal infrastructure