General Information

K-RERA/PRJ/TVM/123/2022
01/06/2022
MISTY ORCHIDS
MALABAR DEVELOPERS PVT LTD
Villas (Plots & Buildings)
20/07/2022


Quarterly updated values

Project Information

MISTY ORCHIDS
Villas (Plots & Buildings)
01/06/2022
31/12/2025
Yes
No

Land Details

4503
16
2713
2713
0
0
0

Location Details of the Project Area

28,28/1,28/2,28/3,28/4,28/5,28/6-4
23181
KERALA
Thiruvananthapuram
KATTAKADA
MALAYINKEEZH
NEAR MEDICARE HOSPITAL
PIDARAM
695571
7M WIDE ROAD
Others Property
Others Property
Others Property

Mortgages

Promoter's Information - Other Than Individual


Company
MALABAR DEVELOPERS PVT LTD
Yes
No

Registered address of the Promoter

16/501-O, MHQ, MONTANA
PAINGOTUPURAM
PERINGOLAM P O
MALABAR HEAD QUARTERS
KERALA
Kozhikode
Kozhikode
KUNNAMANGALAM
673571

Address for official communication

16/501-O, MHQ, MONTANA
PAINGOTUPURAM
PERINGOLAM P O
MALABAR HEAD QUARTERS
KERALA
Kozhikode
Kozhikode
KUNNAMANGALAM
673571
Member Name Designation Photo
MADATHUM PARAMBATH AHAMMAD Managing Director View Photo
ASHER OTTAMOOCHIKKAL Director View Photo
SHADULY HASSAN Authorized Signatory View Photo
ABDUL YASHIR ADI RAJA Authorized Signatory View Photo

Co-promoter/ Land owner details

Land owner Name Type of Land Owner PAN Number Type of Agreement/ Arrangement Office Number (With area code) Other Details

Promoter's Past Experience Details

Sr No. Project Name RERA registration number Project Address Land Area (In Sq mtrs) Details of payments pending Current status of the project Details of cases/ litigations related to the project Date of commencement Proposed date of completion Actual completion date Remarks (If any) Other relevant experience
1 CLOUDBERRY CLOUDBERRY VILLAMENT, MONTANA ESTATE, PAINGOTUPURAM, KUTTIKKATTOOR, KOZHIKKODE- 673571 15493.94 0 ON GOING 0 05/08/2017 10/07/2026 NA ACTUAL DATE OF COMPLETION 30/07/2026 NA
2 BAMBOO PARK -1 GREEN COUNTY, KODASSEERY THAZHAM, PERUVAYAL, KOZHIKODE 1373.50 0 COMPLETED 0 01/04/2016 05/11/2018 05/11/2018 NA NA
3 BAMBOO PARK II GREEN COUNTY, KODASSERRY THAZHAM, PERUVAYAL, KOZHIKKODE 1983.80 0 ON GOING 0 15/11/2018 31/12/2022 NA NA NA
4 ROYAL MANGROOVE 1 ROYAL MANGROOVE ,PHED ROAD, SAROVARAM, ERANHIPALAM, KOZHIKKODE. 1425.75 0 COMPLETED 0 08/06/2013 10/07/2016 10/07/2016 ACTUAL DATE OF COMPLETION 05/10/2015 NA
5 SILVER LINDEN NEAR MINI BYE PASS, MEENCHANDA, KOZHIKKODE 6512.02 0 COMPLETED 0 12/04/2014 22/06/2017 22/06/2017 NA NA
6 TURMERIC PARK NEAR NELLIKKAPULLI PALAM, EDAKKAD, KUNDUPARAMBU, KOZHIKKODE 2235.03 0 COMPLETED 0 25/02/2015 03/12/2016 03/12/2016 NA NA
7 ROYAL PINE BEHIND SILKY WEDDING , NEAR SAROVARAM PARK, KOZHIKKODE 1566.22 0 COMPLETED 0 26/06/2016 10/03/2019 10/03/2019 NA NA
8 GRAND OAK GRAND OAK, CHEROOTY NAGAR HOUSING COLONY, OPP SWIMMING POOL, KOZHIKKODE 2022.01 0 COMPLETED 0 16/04/2015 31/01/2019 31/01/2019 NA NA
9 ROYAL MULBERRY ROYAL MULBERRY, NEAR PROVIDENCE WOMENS COLLEGE, KOZHIKKODE. 1515.78 0 ON GOING 0 24/04/2017 31/12/2021 NA NA NA
10 GRAND MAPLE GRAND MAPLE, OPP RASHTRA DEEPIKA, CMS COLLEGE ROAD, BAKER JUNCTION, KOTTAYAM 4151.05 0 COMPLETED 0 24/11/2014 27/02/2019 27/02/2019 NA NA
11 GRAND CEDAR GRAND CEDAR, GOLF LINK ROAD, KOWDIAR, THIRUVANANTHAPURAM. 1809 0 COMPLETED 0 24/06/2016 05/07/2019 05/07/2019 NA NA
12 RED ORCHID RED ORCHID, NEWAR MEDICARE HOSPITAL, MALAYINKEEZHU PO, PIDARAM, THIRUVANANTHAPURAM 4323 0 ON GOING 0 01/12/2016 31/12/2022 NA NA NA
13 GRAND CYPRESS GRAND CYPRESS, NEAR ST. SEBASTIAN CHURCH, KADAVANTHARA, K P VALLON ROAD, ERNAKULAM 1917.02 0 COMPLETED 0 05/12/2015 24/09/2018 24/09/2018 NA NA
//}

Promoter's Track Record

26
0
9
90077
4
53869

Building Permit Details

Building Permit Number Dated Type Date of Expiry Issued by Name of the Local body/ LSGI

Development Permit Details

Development Permit Number Dated Type Date of Expiry Issued by Name of the Local body/ LSGI

Building Details

Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 1RK 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.05 16.73 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
8 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
9 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
10 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
11 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.73 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
12 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 127.41 16.05 6.16 0 0 16.05 166.35 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
13 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 107.14 15.75 7.18 0 0 16.19 146.26 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
14 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 107.14 15.75 7.18 0 0 16.19 146.26 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
15 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 164.80 13.17 14.13 0 0 20.15 212.25 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
16 MISTY ORCHIDS 31/12/2025 0 0 0 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 164.80 13.17 14.13 0 0 20.15 212.25 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1 Residential 1 0 0 NA

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 X number of Basement(s) and Plinth
3 Stilt Floor
4 X number of Slabs of Super Structure
5 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
6 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
9

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Plot Details

Area of Plot (In sqmts) Number of Plots Number of Plots Booked / Alloted / Sold
Current value Last Quarter value
4503 16 0 0

Common Areas and Facilities

Project Details

Name Proposed Number Progress of work done (In %)
Current value Last Quarter value
Number of Garages/ Covered Parking (In Numbers) (Common Area) 0

Development Work

Common areas And Facilities, Amenities Proposed Percentage of completion No of Units Carpet Area (sqm) Details
Current value Last Quarter value
Internal Roads & Footpaths :
Water supply :
Storm water drains :
Street lighting :

Professional Information

Professional Name RERA Certificate No. Professional Type Type of Contractor Registration Number Name of the firm Address of the firm Year of establishment Name of Promoters Associated with Key projects completed Type of Professional
DEEPU SASIDHARAN NA Architect NA CA/2009/45245 MALABAR MONTANA ESTATE 2019 NA ORCHID SPRINGS NA
SAJITH C NA Engineer NA NA MALABAR MONTANA ESTATE 2019 NA MHQ, GRAND OAK, ROAYL PINE NA
KRISHNA KUMAR UNNI NA Chartered Accountant NA 210839 AAKKASSOCIATES 9/279/F THIRD FLOOR, SG ARCADE, K T GOPALAN ROAD, KOTTOOLI, KOZHIKKODE673016 2007 NA MALABAR GOLD NA

Uploaded Documents

Document Name Uploaded Document Remarks Uploaded Date
PROJECT DETAILS
Copy of Sanctioned Plans 27/05/2022 12:13:13
Copy of Valid Building Permit
Copy of Valid Development Permit 30/06/2022 15:10:39
Detailed technical specifications to be adopted in the project 06/06/2022 12:17:35
Details of Asccociation Formed
Layout approval plan
Location details of the project with clear demarcation of land with boundaries including Latitude and Longitude of end points 06/06/2022 11:06:53
Occupancy Certificate/ Completion Certificate/ development certificate
Site Plan / Site Map
The Plan of development works to be executed in the proposed project - Plan of fire fighting,evacuation services,use of renewable energy, drinking water service etc to be included-Charts and project schedule 06/06/2022 11:58:51
LAND DETAILS
Copy of latest Land Tax Receipt 07/07/2022 09:43:00
Copy of latest Land Tax Receipt 07/07/2022 09:44:35
Copy of latest Land Tax Receipt 27/05/2022 13:16:48
Copy of Title Deed 26/05/2022 12:58:31
Details of Encumbrance EC - 1/1/17 - 30/06/22 07/07/2022 10:33:52
Details of Encumbrance 06/06/2022 11:19:56
Land title search report (From an advocate as specified in Rule 17) 26/05/2022 13:03:52
Performa of Conveyance Deed / Sales Deed 28/05/2022 10:14:59
PROMOTER DETAILS
The annual report including audited profit and loss account, balance sheet, cash flow statement, directors report and auditor's report of the promoter for the immediately preceding three financial years and where annual report is not available then the audited profit and loss account, balance sheet, cash flow statement and the auditor's report of the promoter for immediately preceding three financial years and in case of newly incorporated or registered entity, such information shall be disclosed for the parent entity. 06/06/2022 11:00:56
The annual report including audited profit and loss account, balance sheet, cash flow statement, directors report and auditor's report of the promoter for the immediately preceding three financial years and where annual report is not available then the audited profit and loss account, balance sheet, cash flow statement and the auditor's report of the promoter for immediately preceding three financial years and in case of newly incorporated or registered entity, such information shall be disclosed for the parent entity. 06/07/2022 10:58:15
The annual report including audited profit and loss account, balance sheet, cash flow statement, directors report and auditor's report of the promoter for the immediately preceding three financial years and where annual report is not available then the audited profit and loss account, balance sheet, cash flow statement and the auditor's report of the promoter for immediately preceding three financial years and in case of newly incorporated or registered entity, such information shall be disclosed for the parent entity. 06/07/2022 10:59:22
ALLOTMENT DETAILS
Performa of Agreement for Sale (As per Annexure A) 06/07/2022 15:04:40
Performa of Agreement for Sale (As per Annexure A) 20/07/2022 11:53:06
Performa of Agreement for Sale (As per Annexure A) 28/05/2022 10:14:44
Performa of Allotment Letter 26/05/2022 13:34:38
ARCHITECT,ENGINEER & CA Certificates
Architect's Certificate in Form 6
NOC and other Clearance
Clearance from Airport Authority of India 14/06/2022 11:33:04
Clearance from Coastal Zone Management Authority 14/06/2022 11:33:57
Clearance from National Highways / Railways / Other Relevant Departments
Concurrence / Layout Approval of Town and Country planning department
Consent to establish & operate (Clearance from Pollution Control Board) 14/06/2022 11:34:24
Environment Clearance 14/06/2022 11:34:43
Final Fire NOC 14/06/2022 11:35:06
If the project is proposed to be developed in Phases, an authenticated copy of license or land use permission, Building sanction plan or building permit for each of such phases (If applicable)
Initial NOC from Fire and Rescue department 14/06/2022 11:35:21
Permission from Water and sewerage department
BROCHURE & OTHER DETAILS
Brochure / prospectus issued in regard to this project 17/06/2022 14:35:10
Others 17/06/2022 14:38:46
Others 17/06/2022 14:39:09
Others 17/06/2022 14:32:46
Sanction letters form bank for home loan tie-ups
Sanction letters from Bank for construction finance

Litigations Related to the Project