Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
1 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
2 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
3 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
4 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
1RK |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
5 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
6 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.05 |
16.73 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
7 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
8 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
9 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
10 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
11 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.73 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
12 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
127.41 |
16.05 |
6.16 |
0 |
0 |
16.05 |
166.35 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
13 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
107.14 |
15.75 |
7.18 |
0 |
0 |
16.19 |
146.26 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
14 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
107.14 |
15.75 |
7.18 |
0 |
0 |
16.19 |
146.26 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
15 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
164.80 |
13.17 |
14.13 |
0 |
0 |
20.15 |
212.25 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|
Sr.No. |
Building Name
|
Proposed Date of Completion (As committed to allottees)
|
Number of Basements
|
Number of Podiums
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Number of Closed Parking
|
16 |
MISTY ORCHIDS
|
31/12/2025
|
0
|
0
|
0
|
0 |
0 |
0 |
|
|
Apartments Type Details
Sr.No.
|
Apartment Type
|
Carpet Area
|
Area of exclusive veranda
|
Area of exclusive balcony
|
Area of exclusive open terrace
|
Share of common area
|
Area of external wall
|
Total area
|
Proposed number of apartments
|
Number of apartments Booked /Sold /Allotted
|
Current value
|
Last Quarter value
|
1 |
Bangalow / Villas |
164.80 |
13.17 |
14.13 |
0 |
0 |
20.15 |
212.25 |
1 |
|
|
|
|
|
Parking space for Sale Details
Sr.No.
|
Parking Type
|
No. of Garages/ Covered Parking
|
Area (in Sqmts)
|
No. of Garages/ Covered Parking booked
|
Current value
|
Last Quarter value
|
1 |
Residential |
1 |
0 |
0 |
NA |
|
|
|
Task/Activity Details
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
Current value |
Last Quarter value |
1
|
Excavation
|
|
|
2
|
X number of Basement(s) and Plinth
|
|
|
3
|
Stilt Floor
|
|
|
4
|
X number of Slabs of Super Structure
|
|
|
5
|
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
|
|
6
|
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
|
|
|
7
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
|
|
8
|
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
|
|
|
9
|
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby(s), plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
|
|
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
0
|
|