General Information

K-RERA/PRJ/116/2021
VIOLET HOMES
OMG PROPERTIES PRIVATE LIMITED
Villas (Plots & Buildings)
22/08/2023
Click Here

Quarterly updated values

Project Information

VIOLET HOMES
Villas (Plots & Buildings)
20/02/2020
16/02/2025
Yes
No

Land Details

1052
7
586
586
0
7
0

Location Details of the Project Area

55/31,55/43
10634,10635,10657
KERALA
Palakkad
Palakkad
MARUTHUROAD
THEKUMURRI , CHANDRANAGAR
PALAKKAD
678007
Property of Vinod Kumar
Tamil Colony
Property of Premkumar
5mtr Wide Road

Mortgages

Promoter's Information - Other Than Individual


Company
OMG PROPERTIES PRIVATE LIMITED
Yes
No

Registered address of the Promoter

18/465-19,FIRST FLOOR
VICTORY CORNER
KOPPAM
KOPPAM VILLAGE OFFICE
KERALA
Palakkad
Palakkad
PALAKKAD MUNCIPALITY
678001

Address for official communication

18/465-19,FIRST FLOOR
VICTORY CORNER
KOPPAM
KOPPAM VILLAGE OFFICE
KERALA
Palakkad
Palakkad
PALAKKAD MUNCIPALITY
678001
Member Name Designation Photo
RAJANEESH V G NAIR Managing Director View Photo
SURESH V Authorized Signatory View Photo
GIREESH S Managing Director View Photo

Land owner details

Land owner Name Type of Land Owner PAN Number Type of Agreement/ Arrangement CreatedOn Office Number (With area code) Other Details
Land owner Name Type of Land Owner PAN Number Type of Agreement/ Arrangement CreatedOn Office Number (With area code) Other Details

Promoter's Past Experience Details

Sr No. Project Name RERA registration number Project Address Land Area (In Sq mtrs) Details of payments pending Current status of the project Details of cases/ litigations related to the project Date of commencement Proposed date of completion Actual completion date Remarks (If any) Other relevant experience
1 NIL NIL 0 0 0 O 12/09/2018 18/03/2022 NA 0 0
//}

Promoter's Track Record

10
5
15
20000
9
10000

Building Permit Details

Building Permit Number Dated Type Date of Expiry Issued by Name of the Local body/ LSGI

Development Permit Details

Development Permit Number Dated Type Date of Expiry Issued by Name of the Local body/ LSGI

Building Details

Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
1 VM1 31/12/2022 1 1 2 0 0 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 69.90 0 2.90 0 0 0 72.80 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
2 VM2 31/12/2022 1 1 2 0 1 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 60.83 0 2.37 0 0 0 63.20 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
3 VM3 31/12/2022 1 1 2 0 1 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 59.91 0 2.37 0 0 0 62.28 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
4 VM4 31/12/2022 1 1 2 0 1 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Shops and Showrooms 73.93 0 2.94 0 0 0 76.87 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
5 VM5 31/12/2022 1 1 2 0 1 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 69.67 0 3.06 0 0 0 72.73 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
6 VM6 31/12/2022 1 1 2 0 1 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 69.90 0 2.90 0 0 0 72.80 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Building Name Proposed Date of Completion (As committed to allottees) Number of Basements Number of Podiums Number of Slab of Super Structure Number of Stilts Number of Open Parking Number of Closed Parking
7 VB1 31/12/2022 1 1 2 0 1 0

Apartments Type Details

Sr.No. Apartment Type Carpet Area Area of exclusive veranda Area of exclusive balcony Area of exclusive open terrace Share of common area Area of external wall Total area Proposed number of apartments Number of apartments Booked /Sold /Allotted
Current value Last Quarter value
1 Bangalow / Villas 64.45 0 3.67 0 0 0 68.12 1

Parking space for Sale Details

Sr.No. Parking Type No. of Garages/ Covered Parking Area (in Sqmts) No. of Garages/ Covered Parking booked
Current value Last Quarter value
1

Task/Activity Details

Sr.No. Tasks / Activity Percentage of Work
Current value Last Quarter value
1 Excavation
2 Basement(s) and Plinth
3 Stilt Floor
4 Slabs of Super Structure
5 Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings
6 Sanitary Fittings
7 Electrical Fittings
8 Staircases, Lifts Wells
9 Overhead and Underground Water Tanks.
10 The external plumbing and external plastering
11 Completion of terraces floor each building
12

Installation of lifts, water pumps etc

13

Fire Fighting Fittings and Equipment

14

Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc

10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Plot Details

Area of Plot (In sqmts) Number of Plots Number of Plots Booked / Alloted / Sold
Current value Last Quarter value
1052 7 7 NA

Common Areas and Facilities

Project Details

Name Proposed Number Progress of work done (In %)
Current value Last Quarter value
Number of Garages/ Covered Parking (In Numbers) (Common Area) 0

Development Work

Common areas And Facilities, Amenities Proposed Percentage of completion Details
Current value Last Quarter value
Street lighting :
Internal Roads & Footpaths :
Water supply :
Sewerage (Chamber, Lines, Septic tank, STP) :
Storm water drains :
Landscaping & Tree planting :

Professional Information

Professional Name RERA Certificate No. Professional Type Type of Contractor Registration Number Name of the firm Address of the firm Year of establishment Name of Promoters Associated with Key projects completed Type of Professional
Sajan IPE pulimood NA Architect NA CA/80/5679 ARCUS DESIGN Darussalam white house, thrikkandiyur PO, Tirur 676104, malappuram 2017 kerala government aluva government hospital NA
Yazeed ALI P NA Engineer NA NA PLANEX ASSOCIATES 1st floor, nediyodath building, govt hospital road, tirur 7, malappuram 2016 kerala goverment govt aluva hospital NA
Radhakrishnan P NA Chartered Accountant NA mno.217128 na na 2005 na na NA

Uploaded Documents

Document Name Uploaded Document Remarks Uploaded Date
PROJECT DETAILS
Copy of Building Permit 21/04/2021 17:30:34
Copy of Development Permit 21/04/2021 17:30:56
Copy of Sanctioned Plans 21/04/2021 17:31:19
Detailed technical specifications to be adopted in the project 21/04/2021 17:36:46
Details of Association Formed
Layout approval plan 06/12/2022 15:00:27
Location details of the project with clear demarcation of land with boundaries including Latitude and Longitude of end points 24/01/2023 17:47:36
Location details of the project with clear demarcation of land with boundaries including Latitude and Longitude of end points 21/04/2021 17:36:32
Occupancy Certificate/ Completion Certificate/ development certificate 17/08/2022 17:30:29
Occupancy Certificate/ Completion Certificate/ development certificate 21/07/2023 15:53:30
Site Plan / Site Map 06/12/2022 15:00:51
LAND DETAILS
Copy of latest Land Tax Receipt 21/04/2021 17:34:45
Copy of Title Deed 21/04/2021 17:33:37
Details of Encumbrance 21/04/2021 17:35:01
Land title search report 21/04/2021 17:34:17
Proforma of Conveyance Deed / Sales Deed 21/04/2021 17:32:47
PROMOTER DETAILS
Declaration in Form B 21/04/2021 17:25:42
The annual report including audited profit and loss account, balance sheet, cash flow statement, directors report and auditor's report of the promoter for the immediately preceding three financial years and where annual report is not available then the audited profit and loss account, balance sheet, cash flow statement and the auditor's report of the promoter for immediately preceding three financial years and in case of newly incorporated or registered entity, such information shall be disclosed for the parent entity.
ALLOTMENT DETAILS
Proforma of Agreement for Sale (As per Annexure A) 21/04/2021 17:37:05
Proforma of Allotment Letter 21/04/2021 17:31:55
ARCHITECT,ENGINEER & CA Certificates
Architect's Certificate in Form 2
Chartered Accountant's Certificate in Form 4 (in letter head) 22/08/2023 16:18:20
Chartered Accountant's Certificate in Form 4 (in letter head) 22/08/2023 16:18:46
Chartered Accountant's Certificate in Form 4 (in letter head) 22/08/2023 16:19:26
Chartered Accountant's Certificate in Form 4 (in letter head) 22/08/2023 16:19:57
Declaration by the Promoter - Form No. 6 21/07/2023 17:59:08
Engineer's Certificate in Form 3
NOC and other Clearance
Clearance from Airport Authority of India
Clearance from Coastal Zone Management Authority
Clearance from National Highways / Railways / Other Relevant Departments
Concurrence / Layout Approval of Town and Country planning department
Consent to establish (Clearance from Pollution Control Board)
Consent to operate (Clearance from Pollution Control Board)
Environment Clearance
Final Fire NOC
If the project is proposed to be developed in Phases, an authenticated copy of license or land use permission, Building sanction plan or building permit for each of such phases (If applicable)
Initial NOC from Fire and Rescue department
Permission from Water and sewerage department
BROCHURE & OTHER DETAILS
Brochure / prospectus issued in regard to this project 10/05/2022 17:45:24
Others
Sanction letters form bank for home loan tie-ups
Sanction letters from Bank for construction finance
PLAN OF DEVELOPMENT WORKS
Charts and the project schedule
List and details of common amenities
Other Plans to be executed in the proposed project
Plan for Drinking water service to be executed in the proposed project
Plan of firefighting to be executed in the proposed project
Plan of Use of renewable energy to be executed in the proposed project
The Plan of development works to be executed in the proposed project 21/04/2021 17:36:04
Land Owner Details
Upload Agreement / MoU Copy 21/04/2021 17:38:07
Upload Agreement / MoU Copy 22/04/2021 12:28:07

Upload Photograph

Document Name Uploaded Document Uploaded Date
Photograph of each building 18/02/2022 15:52:23
Photograph of each building 18/02/2022 15:52:40
Photograph of each building 18/02/2022 15:52:59
Photograph of each building 18/02/2022 15:53:15
Photograph of each building 18/02/2022 15:53:40
Photograph of each building 18/02/2022 15:55:13
Photograph of each building 22/04/2022 14:51:28
Photograph of each building 22/04/2022 14:52:04
Photograph of each building 30/07/2022 17:30:52
Photograph of each building 30/07/2022 17:32:29
Photograph of each building 31/12/2022 14:31:46
Photograph of each building 18/10/2022 12:26:09
Photograph of each floor 13/07/2021 11:08:03
Photographs of common areas and internal infrastructure 13/07/2021 11:08:11
Photographs of common areas and internal infrastructure 04/06/2022 16:58:31
Photographs of common areas and internal infrastructure 04/06/2022 16:58:31
Cover Photo for the project 31/12/2022 14:38:57

Litigations Related to the Project